concrete cut and bulkhead installed

Posting ID : A1068524577
Date Posted : 2015-08-19
Category : General Labor

I need a prefab set of basement stairs installed properly. Foundation cut, cement buried in excavated hole, ground excavated, prefab unit dropped in bolted and sealed to foundation. Backfilled and smoothed. No need to take away dirt from hole or cut concrete, no need to put on bulkhead doors, just dig the hole, cut the foundation, drop in stairs, backfill and smooth.
U have insurance, experience, pull permits.
I have cold hard cash
Scot
Ps. Plenty of room to get at foundation, nice wide open yard. No where near septic either. Clean job.


Some Other Postings