finish bathroom remodel

Posting ID : A1068474116
Date Posted : 2015-08-18
Category : Labor Gigs

Searching for Handyman #4.

1) Shower floor - redo. Handyman #3 installed tile so water sits in the middle and doesn't drain. This has to be redone now.
2) Sand wall, paint ceiling, texture and paint walls and ceiling.
3) A/C duct in ceiling - install box so AC doesn't leak into attic.
4) Install vanity/sink
5) Finish tile work 5-6" on each side of vanity
6) Install 190# glass frameless shower slider door.
7) Install toilet
8) Put cover over electrical outlets

Must have meticulous attention to detail and have own tools.
Ability to pay attention to customer requirements and meet deadlines promised. Will be required to show estimate of work which includes a detailed schedule of each task with estimated hours.
Show up on time. Complete job within 1 week of start. Get paid when job is completed.
Provide pictures of your work.
Provide at least 3 references of clients that I will call.
Already done - electric, plumbing already done.

Sorry, I had to remove my phone/text option since I'm being bombarded with multiple texts from people who give me a first name (sometimes), no email, no references. Would help if anyone has a website (linkedin?) to show their work and references (angies list?).


Some Other Postings