Radiant Barrier Install

Posting ID : A1068471111
Date Posted : 2015-08-18
Category : General Labor

I have a couple rolls of radiant Barrier I need installed in the attic. It is literally just unrolling it and stapling it to the underside of the roof joists. It is a 1300 sq ft home, the job should take 2 people 4-6 hrs. It would be good to start early and get finished before it gets hot. I prefer previous experience or someone familiar with HVAC that is comfortable moving around in an attic. This monday the 24th, the high is 86, the same for tuesday the 25th, I would like to have it done either day or sooner.

Some Other Postings